Papers

Gavan, John C., and Rob Gramlich. John C. Gavan and Rob Gramlich - A New State-Federal Cooperation Agenda for Regional and Interregional Transmission, 2021. Publisher's VersionAbstract

Excerpt from the Introduction:

The experience of grid operators and planners in the United States and around the world has shown that both decarbonization and power system resilience will require large-scale regional and inter-regional trans- mission expansion. In the United States, transmission planning, cost recovery, and siting are all subject to both state and federal jurisdiction. To meet the challenge of expanding transmission to implement decarbonization, the Federal Energy Regulation Commission (FERC) and the National Association of Regulatory Utility Commissioners (NARUC) recently announced the Joint Federal-State Task Force on Electric Transmission to focus on this issue.1 Resolving issues of siting and cost recovery for interstate electric transmission lines will encourage constructive state-federal cooperation. The task force and related regional and national coordination among the states, FERC, the Department of Energy (DOE), and federally regulated transmission providers will be critical to ensuring a resilient and clean power system.

Commission, Federal Energy Regulatory. 18 CFR Part 35. Order No. 2000, Regional Transmission Organizations, 2000.Abstract

The Federal Energy Regulatory Commission (Commission) is amending its regulations under the Federal Power Act (FPA) to advance the formation of Regional Transmission Organizations (RTOs). The regulations require that each public utility that owns, operates, or controls facilities for the transmission of electric energy in interstate commerce make certain filings with respect to forming and participating in an RTO. The Commission also codifies minimum characteristics and functions that a transmission entity must satisfy in order to be considered an RTO. The Commission's goal is to promote efficiency in wholesale electricity markets and to ensure that electricity consumers pay the lowest price possible for reliable service.

FERC, Principles for Efficient and Reliable Reactive Power Supply and Consumption, 2004.Abstract

EXCERPT FROM THE EXECUTIVE SUMMARY:

Almost all bulk electric power in the United States is generated, transported and consumed in an alternating current (AC) network. Elements of AC systems produce and consume two kinds of power: real power (measured in watts) and reactive power (measured in volt-amperes reactive, or var). Real power accomplishes useful work (e.g., running motors and lighting lamps). Reactive power supports the voltages that must be controlled for system reliability.

Reactive power supply is essential for reliably operating the electric transmission system. Inadequate reactive power has led to voltage collapses and has been a major cause of several recent major power outages worldwide. And while the August 2003 blackout in the United States and Canada was not due to a voltage collapse as that term has been traditionally used, the final report of the U.S.-Canada Power System Outage Task Force (April 2004) said that “insufficient reactive power was an issue in the blackout.” Dynamic capacitive reactive power supplies were exhausted in the period leading up to the blackout.

FERC, Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards., 2005.Abstract

SUMMARY:

Pursuant to Subtitle A (Reliability Standards) of the Electricity Modernization Act of 2005, which added a new section 215 to the Federal Power Act (FPA), the Commission is proposing to amend its regulations to incorporate:

(1) Criteria that an entity must satisfy in order to qualify to be the Electric Reliability Organization (ERO) that will propose and enforce Reliability Standards for the Bulk-Power System in the United States, subject to Commission approval;

(2) Procedures governing enforcement actions by the ERO and the Commission;

(3) Criteria under which the ERO may enter into an agreement to delegate authority to a Regional Entity for the purpose of proposing Reliability Standards to the ERO and enforcing Reliability Standards;
(4) Procedures for the establishment of Regional Advisory Bodies that may provide advice to the Commission, the ERO or a Regional Entity on matters of governance, applicable Reliability Standards, the reasonableness of proposed fees within a region, and any other responsibilities requested by the Commission;

(5) Regulations governing the issuance of periodic reliability reports by the ERO that assess the reliability and adequacy of the Bulk-Power System in North America; and
(6) Regulations pertaining to the funding of the ERO.

Pages