Staff White Paper on Guidance Principles for Clean Power Plan Modeling." Federal Energy Regulatory Commission, AD16-14-000, 2016."” In, 2016.Abstract

Executive summary

On August 3, 2015, the U.S. Environmental Protection Agency (EPA) issued the Clean Power Plan (CPP) under Clean Air Act 111(d). The CPP limits carbon dioxide emissions from existing fossil fuel-fired electric power plants by providing state specific goals for carbon dioxide emissions from affected electric generating units. As part of the CPP, EPA considered the potential impacts of the CPP on electric system reliability. Specifically, the CPP requires each state to demonstrate in its final state plan submittal that it has considered reliability issues in developing its plan. Separately, on August 3, 2015, EPA, the U.S. Department of Energy (DOE) and the Commission agreed to coordinate certain activities to help ensure continued reliable electricity generation and transmission during the implementation of the CPP. 

While the CPP assigns no direct role to the Commission, it is possible that the Commission may be called upon, through the EPA-DOE-FERC Coordination Document or for other reasons, to address concerns about reliability as the CPP is implemented. In that case, the use of appropriate modeling tools and techniques will be helpful to the Commission in carrying out its responsibilities for reliability.

 This white paper identifies four guiding principles that may assist transmission planning entities, which may include regional transmission organizations (RTOs), independent system operators (ISOs), electric utilities, or other interested stakeholders, in conducting effective analysis of the CPP and associated state plans, federal plans or multi-state plans (compliance plans). The North American Electric Reliability Corporation (NERC) and the regional electric reliability organizations may also benefit from following these guiding principles as they perform CPP-related analyses. These guiding principles address four areas: (1) transparency and stakeholder engagement; (2) study methodology and interactions between studies; (3) study inputs, sensitivities and probabilistic analysis; and (4) tools and techniques.

Incorporating these guiding principles in the modeling of the CPP compliance plans is one way to promote a robust analysis of the reliability impacts of the CPP. The guiding principles discussed herein may form the basis for additional action by staff, such as industry outreach or technical conferences, or future action by the Commission.

The Clean Power Plan Endangers Electric Reliability: RTO and ISO Market Perspectives.” In, 2015.Abstract

Excerpt from the Executive Summary

Background

The Environmental Protection Agency’s proposed Clean Power Plan (CPP), published in June 2014, raises substantial operational challenges for regional transmission organizations (RTOs). In the CPP, EPA specifies emission reduction targets for 49 of the 50 states, based on EPA’s modeling that purportedly shows that each state can achieve the specified reduction targets through the use of four “building blocks.” States are to develop plans to meet the targets between 2020 and 2030, and are offered “flexibility” to use any combination of the four building blocks specified and/or other means (if approved by EPA) to achieve these targets. The State plans – required by June 30, 2016 (unless an extension is granted) - must specify how each state intends to meet the targets.

While there are many issues, questions and concerns with the ability of states and utilities to meet EPA’s emission reduction targets based on the use of EPA’s four building blocks (or through other means), building block 2, in particular, raises substantial issues for systems operators and RTO/ISO market operations because it involves changing the current methods of how electricity is dispatched throughout the nation’s bulk power systems.

Either FERC or the states have always overseen how security constrained economic dispatch is conducted to maintain reliability while cost-effectively serving customers. But, if EPA’s proposed rule becomes final, it, and not the system operators that federal and state regulators have entrusted, will make such critical decisions for our nation’s utility customers regardless of costs.