Search

Search results

    Parallel Path Flow

    The difference between scheduled and real power flows on a transmission path, assuming zero inadvertent interchange (also called loop flow, unscheduled power flow, or circulating power flow)

    Pancaking

    Paying multiple charges to more than one utility to move (wheel) electric power across bulk-power systems (also called pancaked rates)
    Ludwigson, Jon. “Oversight of RTO's.” In, 2008.Abstract
    Ludwigson, Jon. Oversight of RTO's. Presentation to the Harvard Electricity Policy Group 53rd Plenary Session, December 11, 2008. 13 pages.

Pages