2002
of Texas, Public Utility Commission. “
A Primer on Wholesale Market Design.” In, 2002.
AbstractPublic Utility Commission of Texas. A Primer on Wholesale Market Design. 1 November 2002. Paper, 53 pages.
txpuc_wholesale.market.primer_11-1-02.pdf Anderson, John. “
Retail Competition: A Failed Experiment, or an Essential Reform Just Beginning?” In, 2002.
AbstractAnderson, John. Retail Competition: A Failed Experiment, or an Essential Reform Just Beginning? 27 September 2002. Presentation, 28 pages.
anderson_hepg_retail_competition_092702.pdf Cullen Hitt, Carrie. “
Retail Markets: A Failed Experiment, or an Essential Reform Just Beginning?” In, 2002.
AbstractCullen Hitt, Carrie. Retail Markets: A Failed Experiment, or an Essential Reform Just Beginning? 27 September 2002. Presentation, 10 pages.
hitt_hepg_presentation_0925021.pdf for (NCAT), National Center Appropriate Technology.
The Transition to Retail Competition in Energy Markets: How Have Residential Consumers Fared?, 2002.
AbstractNational Center for Appropriate Technology (NCAT). Introduction and Summary - The Transition to Retail Competition in Energy Markets: How Have Residential Consumers Fared? September 2002. Summary, 3 pages.
ncat_introduction.summary.residential.consumers.retail.competition_9-02.pdf Bradford, Peter. “
Testimony Before the United States Senate Committee on Environment and Public Works Subcommittee on Transportation, Infrastructure and Nuclear Safety - Renewal of the Price Anderson Act.” In, 2002.
AbstractBradford, Peter (Regulatory Assistance Project). Testimony Before the United States Senate Committee on Environment and Public Works Subcommittee on Transportation, Infrastructure and Nuclear Safety - Renewal of the Price Anderson Act. 23 January 2002. Testimony, analysis, 4 pages.
bradford_senate_testimony_priceanderson_1-02.pdf O'Neill, Richard. “
Efficient Market-Clearing Prices in Markets with Nonconvexities.” In, 2002.
AbstractO'Neill, Richard, Paul Sotkiewicz, Benjamin Hobbs, Michael Rothkopf and William Stewart, Jr. Efficient Market-Clearing Prices in Markets with Nonconvexities. 9 December 2002. Paper, 34 pages.
oneill.et_.al_efficient.market.prices_12-9-02.pdf Ruff, Larry. The Alberta. “
The Alberta Electricity Market: Structuring for Competition.” In, 2002.
AbstractRuff, Larry. The Alberta Electricity Market: Structuring for Competition. 6 March 2002. Paper, 35 pages.
ruff_alberta_pool_final_06mar02.pdf M, New Zealand Electricity. “
Assessment of Outcomes Achieved by Full Nodal Pricing in NZEM.” In, 2002.
AbstractNew Zealand Electricity Market (NZEM). Assessment of Outcomes Achieved by Full Nodal Pricing in NZEM. 18 December 2002. Paper, 69 pages.
nzem_nodal.pricing.assessment_12-18-02.pdf Daxhelet, O., and Y. Smeer. “
Cross Border Trade: A Two-Stage Equilibrium Model of the Florence Regulatory Forum Proposals.” In, 2002.
AbstractDaxhelet, O. and Y. Smeers. Cross Border Trade: A Two-Stage Equilibrium Model of the Florence Regulatory Forum Proposals. 24 July 2002. Paper, 63 pages.
daxheletsmeers_crossborder.trade_.2stage.equilibrium.model_7-24-02.pdf Daxhelet, O., and Y. Smeer. “
Cross Border Trade: A Two-Stage Equilibrium Model of the Florence Regulatory Forum Proposals.” In, 2002.
AbstractDaxhelet, O. and Y. Smeers. Cross Border Trade: A Two-Stage Equilibrium Model of the Florence Regulatory Forum Proposals. 24 July 2002. Paper, 63 pages.
daxheletsmeers_crossborder.trade_.2stage.equilibrium.model_7-24-02.pdf Ministry of Economy, Trad. “
First Report to the Leaders on the US - Japan Regulatory Reform and Competition Policy Initiative.” In, 2002.
AbstractMinistry of Economy, Trade and Industry: Agency for Natural Resources and Energy. First Report to the Leaders on the US - Japan Regulatory Reform and Competition Policy Initiative. 25 June 2002. Report, 50 pages.
japan_us_regulatory_reform_initiative_6-25-02.pdf Kristiansen, Tarjei. Less. “
Lessons for the US.” In, 2002.
AbstractKristiansen, Tarjei. Lessons for the US. 30 October 2002. Presentation, 44 pages.
kristiansen_europe_lessons_us_usaee_11-02.pdf Henney, Alex, and Tim Russ. “
Lessons from The Institutional Framework of Transmission, System Operation, and Energy Markets in Most West European Countries and Some Other Countries Ò The Case for Transcos.” In, 2002.
AbstractHenney, Alex and Tim Russell. Lessons from The Institutional Framework of Transmission, System Operation, and Energy Markets in Most West European Countries and Some Other Countries Ò The Case for Transcos. 1 July 2002. FERC Docket No. RM 01-12-00. 47 pages.
henney_transcos_ferc_sub_1-7-02.pdf Henney, Alex, and Tim Russ. “
Lessons from The Institutional Framework of Transmission, System Operation, and Energy Markets in Most West European Countries and Some Other Countries Ò The Case for Transcos.” In, 2002.
AbstractHenney, Alex and Tim Russell. Lessons from The Institutional Framework of Transmission, System Operation, and Energy Markets in Most West European Countries and Some Other Countries Ò The Case for Transcos. 1 July 2002. FERC Docket No. RM 01-12-00. 47 pages.
henney_transcos_ferc_sub_1-7-02.pdf Cripps, Jerrold, and Dougl ". “
National Electricity Tribunal Reasons for Decision: In the Matter of an Application for Review of a NEMMCO Determination on the SNI Interconnector dated 6 December 2001 Appendices.” In, 2002.
AbstractCripps, Jerrold and Douglas Williamson (
National Electricity Tribunal). Reasons for Decision: In the Matter of an Application for Review of a NEMMCO Determination on the SNI Interconnector dated 6 December 2001. Related Appendices. 24 October 2002. Judicial ruling, 73 pages.
cripps_williamson_ruling_nemmco_sni_interconnector_10-24-02.pdf Cripps, Jerrold, and Dougl ". “
National Electricity Tribunal Reasons for Decision: In the Matter of an Application for Review of a NEMMCO Determination on the SNI Interconnector dated 6 December 2001 Appendices.” In, 2002.
AbstractCripps, Jerrold and Douglas Williamson (
National Electricity Tribunal). Reasons for Decision: In the Matter of an Application for Review of a NEMMCO Determination on the SNI Interconnector dated 6 December 2001. Related Appendices. 24 October 2002. Judicial ruling, 73 pages.
cripps_williamson_ruling_nemmco_sni_interconnector_10-24-02.pdf Cornwall, Nigel. The Need. “
The Need for Balance in NETA Imbalance Pricing.” In, 2002.
AbstractCornwall, Nigel. The Need for Balance in NETA Imbalance Pricing. March 2002. Paper, 5 pages.
cornwall_neta_3-02_dwap_view.pdf Glachant, Jean-Michel, and ". “
Nordic Electricity Congestion's Arrangement as a Model for Europe: Physical Constraints or Operator's Opportunism? MIT CEEPR.” In, 2002.
AbstractGlachant, Jean-Michel and Virginie Pignon. Nordic Electricity Congestion's Arrangement as a Model for Europe: Physical Constraints or Operator's Opportunism? 29 September 2002. MIT CEEPR Working Paper No. 2002-06, 26 pages.
glachant_pignon_nordic.elec_.congest_9-29-02.pdf Glachant, Jean-Michel, and ". “
Nordic Electricity Congestion's Arrangement as a Model for Europe: Physical Constraints or Operator's Opportunism? MIT CEEPR.” In, 2002.
AbstractGlachant, Jean-Michel and Virginie Pignon. Nordic Electricity Congestion's Arrangement as a Model for Europe: Physical Constraints or Operator's Opportunism? 29 September 2002. MIT CEEPR Working Paper No. 2002-06, 26 pages.
glachant_pignon_nordic.elec_.congest_9-29-02.pdf