2003
Naumann, Steven. “
Too Little Money.” In, 2003.
AbstractNaumann, Steven. Too Little Money. 21 May 2003. Presentation, 14 pages.
naumann_too.little.money_5-21-03.pdf Klein, Abram. “
Too Little Money: Designing Markets to Ensure Adequate Capacity. Policy, Economics and Market Performance.” In, 2003.
AbstractKlein, Abram. Too Little Money: Designing Markets to Ensure Adequate Capacity. Policy, Economics and Market Performance. 21 May 2003. Presentation, 62 pages.
klein_hepg_5_21_03_adequate_capacity.pdf Bowring, Joseph. “
Too Much Money? Too Little Money? Energy Market Cycles and Market Intervention.” In, 2003.
AbstractBowring, Joseph. Too Much Money? Too Little Money? Energy Market Cycles and Market Intervention. 21 May 2003. Presentation, 17 pages.
bowring_too.much_.money_5-21-03.pdf on Energy, US Senate Committee, and Natural Resources. “
The 2003 Energy Bill.” In, 2003.
Publisher's VersionAbstractUS Senate Committee on Energy and Natural Resources. The 2003 Energy Bill.
on Energy, US Senate Committee, and Natural Resources. “
The 2003 Energy Bill.” In, 2003.
Publisher's VersionAbstractUS Senate Committee on Energy and Natural Resources. The 2003 Energy Bill.
Brown, Ashley. “
Corporate Governance in Energy: Post-Enron.” In, 2003.
AbstractBrown, Ashley. Corporate Governance in Energy: Post-Enron. 8 May 2003. Presentation, 13 pages.
acb_corporategov_energy_post-enron_5-8-03.pdf Delmas, Magali,, Yesim Tokat (Farsi, Mehdi, Filippini Massimo (Centre Energy for Policy, and Switzerland) Economics. “
"Farsi, Mehdi, and Filippini Massimo (Centre for Energy Policy and Economics, Switzerland). Regulation and Measuring Cost Efficiency with Panel Data Models: Application to Electricity Distribution Utilities".” In, 2003.
AbstractDelmas, Magali, and Yesim Tokat (Farsi, Mehdi, and Filippini Massimo (Centre for Energy Policy and Economics, Switzerland).). Regulation and Measuring Cost Efficiency with Panel Data Models: Application to Electricity Distribution Utilities. January 2003. CEPE Working Paper No. 19, 21 pages.
rose.va_.review.elec_.mkt_.aug_.03.pdf Delmas, Magali,, Yesim Tokat (Farsi, Mehdi, Filippini Massimo (Centre Energy for Policy, and Switzerland) Economics. “
"Farsi, Mehdi, and Filippini Massimo (Centre for Energy Policy and Economics, Switzerland). Regulation and Measuring Cost Efficiency with Panel Data Models: Application to Electricity Distribution Utilities".” In, 2003.
AbstractDelmas, Magali, and Yesim Tokat (Farsi, Mehdi, and Filippini Massimo (Centre for Energy Policy and Economics, Switzerland).). Regulation and Measuring Cost Efficiency with Panel Data Models: Application to Electricity Distribution Utilities. January 2003. CEPE Working Paper No. 19, 21 pages.
rose.va_.review.elec_.mkt_.aug_.03.pdf Delmas, Magali,, Yesim Tokat (Farsi, Mehdi, Filippini Massimo (Centre Energy for Policy, and Switzerland) Economics. “
"Farsi, Mehdi, and Filippini Massimo (Centre for Energy Policy and Economics, Switzerland). Regulation and Measuring Cost Efficiency with Panel Data Models: Application to Electricity Distribution Utilities".” In, 2003.
AbstractDelmas, Magali, and Yesim Tokat (Farsi, Mehdi, and Filippini Massimo (Centre for Energy Policy and Economics, Switzerland).). Regulation and Measuring Cost Efficiency with Panel Data Models: Application to Electricity Distribution Utilities. January 2003. CEPE Working Paper No. 19, 21 pages.
rose.va_.review.elec_.mkt_.aug_.03.pdf Delmas, Magali,, Yesim Tokat (Farsi, Mehdi, Filippini Massimo (Centre Energy for Policy, and Switzerland) Economics. “
"Farsi, Mehdi, and Filippini Massimo (Centre for Energy Policy and Economics, Switzerland). Regulation and Measuring Cost Efficiency with Panel Data Models: Application to Electricity Distribution Utilities".” In, 2003.
AbstractDelmas, Magali, and Yesim Tokat (Farsi, Mehdi, and Filippini Massimo (Centre for Energy Policy and Economics, Switzerland).). Regulation and Measuring Cost Efficiency with Panel Data Models: Application to Electricity Distribution Utilities. January 2003. CEPE Working Paper No. 19, 21 pages.
rose.va_.review.elec_.mkt_.aug_.03.pdf for the Brennan, Timothy (Resources Future). “
State and Federal Roles in Facilitating Electricity Restructuring: Legal and Economic Perspectives.” In, 2003.
AbstractBrennan, Timothy (Resources for the Future). State and Federal Roles in Facilitating Electricity Restructuring: Legal and Economic Perspectives. A revised version of this paper will appear in Regional Transmission Organizations: Restructuring Electricity Transmission in Canada. W.D. Walls, ed. (Calgary: The Van Horne Institute, 2003). April 2003. Paper, 30 pages.
brennan_state.federal.roles_.elec_.restruc_4-03.pdf Delmas, Magali, and Yesim Tokat (University California Energy of Institute). “
"University of California Energy Institute Deregulation Process, Governance Structures and Efficiency: The U.S. Electric Utility Sector".” In, 2003.
AbstractDelmas, Magali and Yesim Tokat (University of California Energy Institute). Deregulation Process, Governance Structures and Efficiency: The U.S. Electric Utility Sector. March 2003. Energy Policy and Economics Working Paper 004, 35 pages.
rose.va_.review.elec_.mkt_.aug_.03.pdf Delmas, Magali, and Yesim Tokat (University California Energy of Institute). “
"University of California Energy Institute Deregulation Process, Governance Structures and Efficiency: The U.S. Electric Utility Sector".” In, 2003.
AbstractDelmas, Magali and Yesim Tokat (University of California Energy Institute). Deregulation Process, Governance Structures and Efficiency: The U.S. Electric Utility Sector. March 2003. Energy Policy and Economics Working Paper 004, 35 pages.
rose.va_.review.elec_.mkt_.aug_.03.pdf Greenleaf, Steve. “
The Costs and Benefits of Cost-Benefit Studies: A Client's Perspective (“To LMP or Not to LMP”).” In, 2003.
AbstractGreenleaf, Steve. The Costs and Benefits of Cost-Benefit Studies: A Client‰Ûªs Perspective (‰ÛÏTo LMP or Not to LMP‰Û). 22 May 2003. Presentation, 20 pages.
greenleaf_cost.benefit_lmp_study_5-22-03.pdf Apt, Jay, and Lester Lave. “
Electric Gridlock: A National Solution.” In, 2003.
AbstractApt, Jay and Lester Lave. Electric Gridlock: A National Solution. 1 October 2003. Perspectives, 3 pages.
Apt, Jay, and Lester Lave. “
Electric Gridlock: A National Solution.” In, 2003.
AbstractApt, Jay and Lester Lave. Electric Gridlock: A National Solution. 1 October 2003. Perspectives, 3 pages.
to West, Hybrid Proposal RTO. “
Introduction to RRG Drafting Team Proposal.” In, 2003.
AbstractHybrid Proposal to RTO West. Introduction to RRG Drafting Team Proposal. 17 November 2003. Draft, 13 pages.
hybrid.proposal.to_.rtowest.draft_.17.nov_.03.pdf Edelston, Bruce. “
Participant Funding: The SeTrans Proposal.” In, 2003.
AbstractEdelston, Bruce. Participant Funding: The SeTrans Proposal. 11 December 2003. Presentation, 26 pages.
edelston.participant.funding.setrans.11.dec_.03.pdf Herling, Steven. “
PJM Regional Transmission Planning Process.” In, 2003.
AbstractHerling, Steven. PJM Regional Transmission Planning Process. 11 December 2003. Presentation, 10 pages.
herling.pjm_.regional.trans_.plan_.process.11.dec_.03.pdf Ott, Andrew. “
PJM-MISO: Achieving a Virtual RTO Through a Joint Operating Agreement.” In, 2003.
AbstractOtt, Andrew. PJM-MISO: Achieving a Virtual RTO Through a Joint Operating Agreement. 26 September 2003. Presentation, 12 pages.
ott.virtual.rto_.hepg_.25.sept_.03.pdf